ReDesk
NewProposals drafted by ReDesk AI in under four minutesSee what's new
Case studySunfield EPC cut feasibility turnaround from 3.4 days to 6 hoursRead the story
Pricing
Sign inSchedule a demo
RePartner · Field operations

Every crew, every step, evidence-backed

Schedule the crews, run the SOP on site, capture the evidence offline, and release the milestone payment only once the work is verified.

iOSAndroidAndroid
Free 14-day trial · No card required
RePartner interface
19 stepstracked on every install
2,400+ crews on the network
Browse the catalogue ›
SalesforceHubSpotZohoQuickBooksTallyRazorpayBBPSSolarEdgeGrowattGST e-invoice
All products ›
Why teams switch

The site tells you what happened, not the other way round

One SOP, every install

The checklist your best crew follows becomes the checklist everyone follows — with photo evidence at each gate.

Scheduling that respects reality

Skills, certifications, travel time and part availability decide the roster, not a whiteboard.

Payment against verified work

A milestone releases when its evidence passes review. No advance, no chasing, no dispute.

Product tour

Dispatch, execute, verify, pay

Read the docs ›
Roof polygon and array layoutProposal builder with pricingExecution board with approvalsAnalytics with revenue against target
Part of the stack

RePartner runs the job ReStudio designed

Tasks come from the approved design, parts come from ReCart, the customer watches progress in RePrime, and the commissioning reading lands in ReLink — one thread from schedule to switch-on.

ReStudioReCart BuyerRePrimeReLink
redesk.ai / projects / nagpur-rooftop-4.2mwLive
ReDesk execution board writing to the shared project record
Capabilities

Everything the operations desk asked for

Offline-first mobile

Crews work the SOP with no signal; photos, readings and signatures queue and sync automatically.

Skill and certificate tracking

Expired certifications block assignment before dispatch, not after the inspection.

Geotagged evidence

Every photo carries location, timestamp and the step it belongs to, so the record defends itself.

Scoped subcontractor access

Partners see only their own steps, their own rates and their own payment ledger.

Snag and rework loops

A failed gate opens a snag with an owner and a due date, instead of a message that gets lost.

Live job costing

Labour hours, travel and materials post against the project as they happen, not at month end.

19
SOP steps tracked on every install
41%
Fewer return visits for rework
2.1 days
Faster average time to commissioning
₹24,780
Released against verified work each week
Nagpur · 4.2 MW rooftop portfolio
“We stopped rebuilding the same quote in three tools. The estimator finishes a proposal before the site engineer has left the roof.”
Meera IyerHead of Projects, Sunfield EPC
Pune · 11 MW C&I portfolio
“The lender stopped asking for a call. Every assumption behind the yield is a link now, so the file answers the question before it is asked.”
Rohit DesaiDirector, Arka Renewables
Kochi · 2.8 MW rooftop
“Margin used to be a month-end surprise. I can see which project is drifting on the day it starts drifting.”
Kavya MenonHead of Finance, Helios Power
Questions

Questions teams ask first

The mobile flow is built for one gloved thumb in bright sun, works with no signal, and asks for the photo at the moment the step is done rather than at the end of the day.

They are invited into a scoped workspace — their jobs, their steps, their rates. They never see your margin or another partner’s work.

Yes. Import your existing checklist and we map it to gates and evidence types. Most teams tighten it after the first month of real data.

A milestone releases when its required evidence passes review. You choose whether review is automatic, sampled, or always human.