



Almost all of the new supply is solar and wind — and someone has to install it.
India's rooftop solar additions more than doubled year over year in 2025, led by residential demand.

Generation is outpacing evacuation capacity, and curtailment is rising with it.

Subsidy targets now depend on how fast the last mile can actually deploy and commission.


India's rooftop solar additions more than doubled year over year in 2025, led by residential demand.

Generation is outpacing evacuation capacity, and curtailment is rising with it.

Subsidy targets now depend on how fast the last mile can actually deploy and commission.
Eleven capabilities, one project record. Each card runs the capability live in its own frame; open it and the same scene plays larger, alongside what it does, how it runs and where it lives in the product.
Describe the site once. The model, the drawings, the SLD, the bill of materials and the DISCOM forms come back as one pack.
From first enquiry to final invoice, ReDesk holds one timeline per project. Sales, procurement, site crews and finance all read and write the same record — no exports, no re-keying, no version drift.



Capture the lead, size the system, price it, and send a branded proposal — then convert it to a project without typing anything twice.
New, contacted, qualified, converted. Sales works the pipeline, ops works the schedule — one underlying record, two views.
Permits, subsidy packets, serial numbers and install photos live on the project — not in an inbox, not on a phone.
Every stage gate records who approved it, when, and against which piece of evidence. Audits stop being an archaeology project.

Draw a territory and see every existing, in-progress and potential rooftop inside it.

Write the standard install once — steps, owners, durations and approval gates.

Milestone payouts, ledger and live margin — released only against verified work.
“Nobody asks which folder the project lives in any more. There is one record, and every answer is already inside it.”
Draw a polygon over any neighbourhood and see every installation, live job and high-potential rooftop inside it — each pin carrying its score.
Draw the area or drop a radius, then refine it until it matches the crew you actually have.
Existing, in progress, potential and lead — colour-coded and filterable down to install date.
Orientation, usable area, shading and load profile, so the sales call opens with a reason.
Estimated monthly units per building, so the pitch starts at the right system size.



Polygon or radius over the area you want to work this month.
Status, install date, roof size or consumption band.
Each pin explains its score before anyone drives out.
Lead, survey and project inherit everything the pin knows.
Turn a converted site into a scheduled install with owners and gates.
See where a converted pin lands and what happens next.
“We qualify a site before anyone drives to it. The map tells us what the roof can carry and what the connection will cost.”
ReStudio works on the real roof plane. Lay the array out against it, watch the shade move across the day, and hand the crew a buildable placement.
Import the outline, pitch and obstructions, then work on a plane that matches the site instead of a sketch.
Fire margins, walkways and edge clearance are held as rules, not remembered by the designer.
Vents, chimneys and walkways stay clear. The array reflows around them rather than being drawn around them.
Sweep the sun across the plane and see which strings lose output, and at what hour.



Aerial imagery or a survey capture gives you the outline, pitch and obstructions.
Drop panels onto the plane; setbacks and obstacles hold their own clearance.
Sweep the day and read which strings dip, then move rows until they do not.
Counts and positions go to the bill of materials and the install SOP.
Assemble the same placement in 3D and walk it before the crew does.
The standard install this placement gets built to.
“The same engine draws an eighteen-site rooftop programme and a ground-mount block. We stopped keeping two design teams.”
Your standard install written down: ordered steps, the role that owns each, and what must be approved before the next opens. Every project inherits it.
Parent steps and durations turn a template into a schedule the moment a project starts.
Each step names the sub-role that may run it, so scheduling only offers eligible people.
Gated steps cannot close until the evidence is uploaded and signed off by name.
Photos, serial numbers, meter readings and signatures attach to the step that needed them.



Steps, owners, durations and the gates that need evidence.
Every new project of that type inherits the full schedule.
The field app shows only the step that is open to them.
Evidence signed off, schedule and payment move together.
Sub-roles, certification and the roster behind every assignment.
Milestone payouts tied to the same verified checkpoints.
“The jurisdiction rule is in the template, not in someone’s head. Drawings come back approved the first time.”
Milestone payments run on AutoPay, BBPS and eNACH rails, releasing only against a verified checkpoint — so margin stays a live number, not a guess.
Split the contract into checkpoints with amounts, triggers and the owner who signs off.
Mandates collected once; collections run on rails your customers already use.
Every release is receipted against the verified checkpoint it paid for.
Line items match the work that was signed off, not a re-typed estimate.



Amounts and triggers agreed with the customer up front.
One AutoPay, BBPS or eNACH setup covers the whole schedule.
The gate on the SOP is the trigger — no separate approval chain.
Money moves, the ledger updates, margin re-reads itself.
Evidence, sign-off and the step that unlocks the payment.
The owner sees the same verified proof, and pays from it.
“Money moves when the work is verified. Margin is no longer a month-end surprise.”
Headcount, certification and safety records sit next to the work they affect, so a step needing a certified installer can only be assigned to one.
Surveyor, installer, electrician, QC. Steps request a sub-role and the roster answers.
An expiring certificate removes someone from the eligible list before they are scheduled.
Kept next to the crew and the site they belong to, not in a separate binder.
Open roles, candidate stage and the gap against the capacity you have planned.



The skills your SOP steps are allowed to ask for.
Expiry dates keep the eligible list honest automatically.
Scheduling only offers people who can legally do the work.
Checkpoints clear, payouts run for staff and partners alike.
Ravi Verma drops off the eligible list in 4 days — his install certification expires before the job is scheduled.
Templates, owners and the gates each crew has to clear.
Labour lands against the project it was spent on.
“Scheduling only offers me people who are certified for the step. That one change ended most of our rework.”
The model the designer works in is the one the customer sees and the crew builds from. Layers assemble in install order; counts flow into the BOM.
Deck, rails, modules and balance of system stack up in the order the crew will build them.
The model is generated from the layout, so the two cannot drift apart.
Conduit runs, inverter clearances and walkway widths checked in the model rather than on the roof.
Share the same model as a plain 3D view — no drawings to interpret.



The placement becomes a model with real rails, clamps and modules.
Step through the build order and check each layer lands where it should.
Clearances and runs are tested before anyone orders material.
Customer view, crew view and bill of materials all come off the same model.
Where the geometry in this model comes from.
The record this model is filed against.
“Households see the array on their own roof before they sign. The submission pack comes off the same model.”
Every project carries its own bill of materials. Stock, dispatches and serial numbers reconcile against it, so a shortage surfaces before the crew does.
The design output becomes the BoM, and procurement is measured against it.
Allocate from the nearest godown and see what that leaves for the next job.
Raise, receive and reconcile without a separate procurement spreadsheet.
Panel and inverter serials scanned on site, filed against the asset for warranty.



No re-typing a parts list from a drawing.
Draw from stock, raise POs for the gaps.
GRN and serials captured at the warehouse or the site.
Cost lands on the project; the entry lands in your books.
DC cable is short by 40 m against the design. The install step stays unschedulable until the GRN lands.
“Every serial is bound to the asset it powers. Lender diligence takes an afternoon instead of a fortnight.”
Feasibility, DISCOM application, subsidy packet, inspection and meter fitting are steps like any other — with owners, ageing and every document filed.
Each state has its own forms and sequence; the template already knows them.
Days-in-stage on every filing, so a stalled application is visible, not remembered.
The packet is built from documents the project already holds.
Photos, readings and signatures captured at the visit that needed them.



Application raised with the documents already on the record.
Receipts filed against the project, ageing clock starts.
Photos and readings captured on the step itself.
Commissioning closes the loop and starts the savings view.
“We can see which application is ageing in which discom, on the day it starts slipping.”
After commissioning the asset keeps talking. Production, savings, battery health and service history land in one screen, pulled through ReLink.
Inverter and meter readings arrive through ReLink and render as today, this month and lifetime.
Units become rupees against the tariff on the bill, so the value is legible without a spreadsheet.
Battery state of health, cleaning schedule, warranty and AMC status sit in the same record.
Connected loads, smart plugs and EV charging, so the household sees where the power goes.



ReLink connects the inverter and meter, and the asset passport fills in from the build record.
Interval data lands as today, this month and lifetime, priced against the tariff on the bill.
Cleaning, warranty and AMC prompts arrive in the same place the numbers do.
Every number here traces back to a device reading, not an estimate. Tap any row to see the interval data behind it.
The same app during deployment.
How the asset gets permission to export.
“Owners open the app instead of calling us. Eighty-four percent of our questions never reach the queue.”
Your field SOP, shown to the customer as checkpoints. Each stage closes with photo evidence, and payment releases against verified work.
The crew works the checklist; the customer sees the same stages as progress.
Photos, serials and sign-offs sit on the checkpoint that produced them.
Milestones release through AutoPay, BBPS or eNACH once work is verified.
Questions raised in the app land on the project, not in a private inbox.



The install template becomes the stages your crew works and the customer watches.
Photos, serials and a sign-off attach to the checkpoint that produced them.
Verified work unlocks the milestone on AutoPay, BBPS or eNACH — nothing before.
The customer sees the same checkpoint the crew ticks. Payment for a stage unlocks only once its evidence is verified.
What the same app becomes after commissioning.
Where these checkpoints come from.
“The customer watches the same milestones we do. Nobody has to be told where the project stands.”
Everything in the ReDesk ecosystem sits on one project record — from the supply chain that sources the hardware up to the app your customer holds.
Layer 3 sources the hardware. Layer 2 runs the operation. Layer 1 is the app your customer holds — homes through to government, all reading the same record.
Discovery, finance, monitoring and trading in one app — from homes and MSMEs up to government, all on the same record.
An AI-equipped CRM, the RePartner manager, net-metering, inventory, mapping and agent architecture — six modules on one record, so nothing is entered twice.
A digital twin of the site on a 3D canvas, hour-by-hour simulation, panel layouts, shading and an itemised bill of materials — designed once, then read straight down into the project record.
Crew tasks, SLAs and step-wise verification. Payouts release against verified work, and every check lands back on the same record.
ReCart is where the hardware comes from: procurement against your BoM, embedded financing, tracked delivery and 200+ verified energy brands — at zero commission.
Five products, one identity and one set of forms. Nothing is entered twice, and every layer sees the same truth.
Grid capacity, filings and subsidy timelines now decide which projects clear, and when they start earning. Sanctioned load, DISCOM queues and ALMM rules change state by state, and the teams tracking them in spreadsheets are the ones losing weeks.

Installers, EPCs and distributors across 21 states. Open any story to see what moved, and by how much. Each team came off spreadsheets and WhatsApp threads onto one project record. The before and after figures are theirs, not ours.

“We stopped running the business out of eleven spreadsheets. The gate on the install step is the same gate that releases the payment, so nobody argues about what “done” means any more.”

“I used to find out a project lost money six weeks after it closed. Now I see the margin move while the crew is still on site.”

“Purchase orders, GRN and Tally line up on their own. Closing a month is a morning, not a week.”

“The subsidy packet builds itself from documents the project already has. DISCOM rejections went from routine to rare.”
Not a twelve-month rollout. Migration, configuration and training happen while your current month keeps running, then you switch. Your data comes across first, and your crews learn the field app on live jobs. Three weeks, one named implementation lead.
We import your projects, customers, price lists and stock from whatever you run today — spreadsheets, Tally, an old CRM. You review, we correct, nothing is typed twice.
Your SOPs become templates: your steps, your sub-roles, your approval gates, your milestone schedule. Configured against how you actually work, not a default.
Office team on the record, crews on the field app. Role-based sessions, in the language the crew speaks, with a sandbox project to practise on.
A named implementation lead through the first month, then support on the same channel. New states and new job types get added as you grow.
Your CRM, your accountant's ledger, the inverters on the roof and the channel your crews read. Connections are set up during week two: thirty-plus of them, most two-way.
Every stage of the asset lifecycle sits on one project record. Scroll to move through it.
Log every lead, run outreach campaigns, and track your pipeline by stage. When a lead converts, all details carry forward into the project automatically.

Pull your design and BoM directly into a branded proposal. Apply rates, milestones, and terms automatically, then collect e-signatures and convert accepted proposals into live projects.

Build project templates, SOP checklists, and document formats by system type. Every new project starts with the right structure, milestones, and compliance requirements.

Set up teams, roles, and access levels that match your structure. Multi-location support keeps branches independent while giving head office visibility across every project and team.

Track pipeline value, project margins, crew performance, and payment collection rates in one dashboard. Drill from a high-level metric down to the individual project or crew driving it.

Your data security and privacy are our top priorities. We maintain the highest standards of compliance.
Ongoing compliance with SOC 2's reporting standards for data security and privacy.
Fully compliant with GDPR for safe and secure data use.
Your data is secured at rest and in transit against unauthorised access.
Encrypted connections are always used for safe data transmission.
Fully compliant with CCPA to ensure consumer data privacy.
Straight answers on migration, field work, data and rollout. These are the questions that come up in the first call. If yours is not among them, ask it and someone who has run an implementation will reply.
We import them. Projects, customers, price lists, stock and historical jobs come across during week one, mapped to ReDesk fields with you reviewing the result. You keep the originals; nothing is retyped.
No. The field app holds the open steps, checklists and photo capture offline, and syncs when the phone is back in range. A verification captured in a basement lands on the record the moment there is a connection.
You do. Every record, document and photo is exportable at any time in open formats, and the API and webhooks are available on every plan. Leaving is a download, not a negotiation.
Yes. Entities, GSTINs and cost centres are first-class, so purchase orders, invoices and ledgers post to the right books. Consolidated reporting sits above them.
Three weeks from kickoff to go-live is typical: migration, configuration against your own SOPs, then role-based training for office and field. A named implementation lead stays with you through the first month.
Most teams start with projects and templates, then switch on financials, inventory or net-metering as they go. Because it is one record, adding a capability does not mean another migration.

Run every project from one place. ReDesk brings your leads, design, procurement, field teams, and payments into a single workflow so nothing falls through the cracks.